It was necessary to prevent vibration and ground borne noise in the adjacent offices of the European Community. Lateral and longitudinal joints were part of the design.
Since SNCB opted for ballasted tracks, a solution was designed with floating slabs (concrete U shaped tubs on a resilient continuous mat, two layers of 25 mm each). The concrete tubs are filled with ballast.
back