For ground borne noise and vibration mitigation, it was decided to put the crossovers on floating slabs (one slab per track). These floating slabs were executed with cast-in-situ concrete elements (9 m length).
The second phase concrete assures the continuity of the floating slab. The resilient bearings are longitudinal.
back